
Strategic Placement Pipe
Strategic placement of the upgraded vent pipe adjacent to the passive stack, prepared for fan connection and roof venting

Radon Fan
The newly installed radon mitigation fan, activated to convert the passive system into a functioning active setup.

Manometer
Manometer gauge monitoring the negative pressure, confirming proper system operation post-activation.